Spot the problems in the indicators’ deviations

Look every week at which goals stray from their target, tell noise from a real problem and choose which ones to tackle.

The task in figures

Gives you back
1.4 h a monthper team; today it takes 2.9 to 7.6 h a month
Elmira today
Helps
Frequency
Weekly
Who does it today
Engineer
How it is done today

What hurts today.

  • People react to every number that drops, and none gets solved.

  • The usual red stops being seen.

  • A problem without an owner shows up again at the next meeting.

A problem, in continuous improvement, is the gap between what was expected and what happened. Every week the engineer goes through their teams’ indicators, looks at which are red and how they are trending, separates normal variation from a real change and picks the few problems worth tackling, each with its owner. Without that filter, the team reacts to every number that drops, or gets used to red and stops seeing it.

Done today with

  • Expert
  • In-person meeting
  • Spreadsheet
  • Email and chat
  • Slides
  • BI dashboard
  • Statistics software
With Elmira

Each step, today and with Elmira.

On WhatsApp, Elmira tells you which goals are at risk or critical and how their indicators are trending; which one is a problem is yours to decide, and she leaves its owner an action with a date.

StepTodayWith Elmira
Check which goals are at risk or critical, and how they are trendingBI dashboard, Spreadsheet15 min – 30 minWhatsApp
Tell normal variation from a real changeStatistics software, Expert15 min – 45 minStill by hand
Choose the problems worth tacklingIn-person meeting, ExpertYour call
Give each one its owner and a dateEmail and chat, Spreadsheet5 min – 15 minWhatsApp
Put them on the problem listSpreadsheet, Slides5 min – 15 minComes with the value office

The conversation

Elmiracontinuous improvement agent
  1. Ana, continuous improvement engineer

    Elmira, which of Packaging’s goals are doing badly, and how are they trending?

  2. In Packaging, “Cut Packaging’s waste” is critical: the waste went up from 3.1% in week 37 to 4.6% in week 40. “Raise line 2’s OEE” is at risk, with the OEE steady at 74% over the last four weeks.

  3. Ana, continuous improvement engineer

    The waste is a real problem. Paula Vera should define it with data by the 16th.

  4. Create the action “Define the waste problem with data”

    Goal: Cut Packaging’s waste

    Team: Packaging

    Responsible: Paula Vera

    Due on October 16, 2026

    ApproveReject
  5. Ana, continuous improvement engineer

    Approve

  6. Done: I created the action “Define the waste problem with data”.