Contain an urgent problem on the line

When something goes wrong on the line, isolate it at once so it does not reach the customer or happen again while the cause is sought.

The task in figures

Gives you back
It does not recur every month
Elmira today
Helps
Frequency
As needed
Who does it today
Engineer
How it is done today

What hurts today.

  • It is coordinated by phone, and what is not written down is not followed up.

  • The product set aside is forgotten in the warehouse.

  • Once it is contained, nobody looks for its cause, and it comes back.

A problem on the line does not wait for the meeting: whatever is going wrong has to be stopped, the suspect product set aside, the right people told and who checks what decided, in minutes. It is the first step of any method (the 8D’s D3, the A3’s containment), and it is done by phone, by shouting and with a list on paper. What is not written down is not followed up: the product set aside is forgotten in the warehouse, and nobody knows later what it cost or what was done.

Done today with

  • On the floor
  • Paper and whiteboard
  • Spreadsheet
  • Email and chat
With Elmira

Each step, today and with Elmira.

You tell Elmira on WhatsApp who checks what, and she sets it down as an action with its owner and its date, with the photos of what happened, and Obeyaka tells them. With the Value Office, the problem is opened to find its cause.

StepTodayWith Elmira
Stop whatever is going wrong and set the suspect product asideOn the floorYour call
Tell the right people: supervision, quality and maintenanceEmail and chat10 min – 20 minStill by hand
Hand out who checks what, and by whenPaper and whiteboard, Email and chat10 min – 20 minWhatsApp
Record what happened, with photosPaper and whiteboard, On the floor10 min – 20 minWhatsApp
Open the problem to find its causeSpreadsheet, Email and chat5 min – 15 minComes with the value office

The conversation

Elmiracontinuous improvement agent
  1. Paula, Packaging supervisor

    Elmira, sealer 2 has been leaving badly sealed boxes since 10 o’clock. We stopped it and set 300 boxes aside. Luis Araya should check them one by one before the shift ends.

  2. Create the action “Check one by one the 300 boxes set aside from sealer 2”

    Goal: Cut Packaging’s waste

    Team: Packaging

    Responsible: Luis Araya

    Due on October 7, 2026

    Done when: every box checked, and the badly sealed ones on the reject rack

    ApproveReject
  3. Paula, Packaging supervisor

    Approve

  4. Done: I created the action “Check one by one the 300 boxes set aside from sealer 2”.