Spot the waste in a process

Walk a process looking for what adds no value (waits, transport, inventory, rework) and turn the biggest into improvements.

The task in figures

Gives you back
It does not recur every month
Elmira today
Helps
Frequency
Per project
Who does it today
Engineer
How it is done today

What hurts today.

  • What adds no value looks normal, because it has always been that way.

  • The list of waste never turns into work.

  • Without knowing what each one costs, the most visible gets tackled.

Lean names eight wastes: overproduction, waiting, transport, overprocessing, inventory, motion, defects and unused talent. Spotting them means walking the process with a customer’s eyes, writing each one down where it happens and estimating what it costs, to tackle the biggest first. An engineer does it with the team, and the list usually ends up in a spreadsheet nobody turns into work.

Done today with

  • Expert
  • In-person meeting
  • On the floor
  • Paper and whiteboard
  • Spreadsheet
  • Email and chat
With Elmira

Each step, today and with Elmira.

You tell Elmira on WhatsApp the wastes you choose to tackle, and she sets them down as actions with their owner and their date, and attaches the photo you send her, which can also be uploaded in Obeyaka. With the Value Office, each keeps what it costs.

StepTodayWith Elmira
Walk the process looking for the eight wastesOn the floorYour call
Write each waste down where it happensPaper and whiteboard, On the floor15 min – 45 minStill by hand
Estimate what each one costsSpreadsheet, Expert30 min – 1.5 hComes with the value office
Choose the ones to tackleIn-person meetingYour call
Turn them into actions with an owner and a dateSpreadsheet, Email and chat15 min – 30 minWhatsApp
Keep each one’s photo with its actionOn the floor5 min – 15 minWhatsApp

The conversation

Elmiracontinuous improvement agent
  1. Ana, continuous improvement engineer

    Elmira, on line 2 the operators wait 20 minutes per shift for the film to arrive from the Warehouse. Felipe Díaz should keep a shift’s worth of film next to the line, by the 23rd.

  2. Create the action “Keep a shift’s worth of film next to line 2”

    Goal: Raise line 2’s OEE

    Team: Packaging

    Responsible: Felipe Díaz

    Due on October 23, 2026

    ApproveReject
  3. Ana, continuous improvement engineer

    Approve

  4. Done: I created the action “Keep a shift’s worth of film next to line 2”.