Implement total productive maintenance (TPM)

Have operators look after their equipment and maintenance prevent breakdowns, so machines stop less.

The task in figures

Gives you back
It does not recur every month
Elmira today
Helps
Frequency
Per project
Who does it today
Senior, Lead
How it is done today

What hurts today.

  • Maintenance lives firefighting.

  • The anomaly tags stay hanging for months.

  • When production pressure rises, TPM is the first thing dropped.

TPM attacks stops at their source: operators clean, inspect and lubricate their equipment, and maintenance moves from firefighting to prevention. It starts with a pilot machine: its OEE is measured, it is deep-cleaned with the operators, each anomaly is tagged and fixed, the autonomous and preventive maintenance plan is built, and each shift is trained. A senior and the maintenance lead lead it, and the hard part is sustaining it when production pressure rises.

Done today with

  • In-person meeting
  • On the floor
  • Paper and whiteboard
  • Spreadsheet
  • BI dashboard
  • Company system
With Elmira

Each step, today and with Elmira.

Elmira brings you the machine’s OEE and stops, sets down each tagged anomaly as an action with its owner and tells you which are still open; when one is late, Obeyaka tells its owner on its own. Cleaning, planning and training stay with the team.

StepTodayWith Elmira
Pick the pilot machine and see its OEE and its stopsSpreadsheet, Company system30 min – 1.5 hWhatsApp
Clean and inspect the machine with the operatorsOn the floor2 h – 8 hStill by hand
Tag each anomaly and turn it into an actionPaper and whiteboard, On the floor30 min – 1.5 hWhatsApp
Build the autonomous and preventive maintenance planSpreadsheet, Company system2 h – 8 hStill by hand
Train each shift in its autonomous maintenanceOn the floor, In-person meeting2 h – 8 hStill by hand
Follow the machine’s anomalies and stopsSpreadsheet, BI dashboard15 min – 30 minAutomatic

The conversation

Elmiracontinuous improvement agent
  1. Diego, Maintenance lead

    Elmira, during the cleaning of sealer 3 we found an oil leak in the cylinder. Jorge Muñoz should fix it by Friday.

  2. Create the action “Fix the oil leak in sealer 3’s cylinder”

    Goal: Cut downtime hours

    Team: Maintenance

    Responsible: Jorge Muñoz

    Due on October 16, 2026

    ApproveReject
  3. Diego, Maintenance lead

    Approve

  4. Done: I created the action “Fix the oil leak in sealer 3’s cylinder”.